3 open work orders · ~1h 30m estimated labor · Nov 13, 2026
high 1 work order
| # | Asset | Location | Description | Est. labor | Status | Done ✓ / notes |
|---|---|---|---|---|---|---|
| WO-0017 | Conveyor Line 1 AST-0003 |
Building A — Plant Floor | Conveyor belt tracking off again at high load. | 1h | in-progress |
medium 1 work order
| # | Asset | Location | Description | Est. labor | Status | Done ✓ / notes |
|---|---|---|---|---|---|---|
| WO-0020 | Boiler — Weil 900 MBH AST-0011 |
Rooftop & Mechanical | Boiler LWCO nuisance trips during blowdown — check probe. | 30m | open |
low 1 work order
| # | Asset | Location | Description | Est. labor | Status | Done ✓ / notes |
|---|---|---|---|---|---|---|
| WO-0019 | Dock Leveler #2 AST-0006 |
Building B — Warehouse | Dock leveler #2 hydraulic seep — reassess after last fix. | — | open |