Dashboard

5 work orders in flight, 2 urgent or high · 4 PM overdue · $4,337.92 spent this month

Work raised · 14 days
5
vs the 14 days before
In flight
3 open · 2 in progress
Overdue PM
3 due within 7 days
Assets down
3 need attention of 15

Needs your action

4 items
  • 4 preventive tasks overduethe longer they slip, the more corrective work they causeOpen PM →
  • 1 asset down right nownot producing until someone is on itSee assets →
  • 2 new requests from the request formsomeone without a login reported a fault; accept it into a work order or decline itOpen requests →
  • 2 parts at or below minimum stocka job stops when the part is not on the shelfOrder parts →

Overdue & due-soon PM

All schedules →
TaskAssetNext dueDays
Compressor oil & separator change Air Compressor — Atlas 75kW
AST-0001
Nov 1, 2026 -12 overdue
Conveyor belt tracking & tension Conveyor Line 1
AST-0003
Nov 9, 2026 -4 overdue
RTU-1 filter change & coil wash Rooftop Unit RTU-1 (North)
AST-0009
Nov 11, 2026 -2 overdue
Forklift 250h service — Hyster Forklift — Hyster H50
AST-0007
Nov 18, 2026 -12 hours overdue
by usage
RTU-2 filter change & coil wash Rooftop Unit RTU-2 (South)
AST-0010
Nov 16, 2026 3 due-soon
Boiler blowdown & low-water cutoff Boiler — Weil 900 MBH
AST-0011
Nov 19, 2026 6 due-soon
CNC way lube & coolant check CNC Mill 3-Axis — Bay 2
AST-0002
Nov 22, 2026 40 hours due-soon
by usage

Recent work orders

The board →
#AssetDescriptionPriority
WO-0021 Yard Sweeper Sweeper vacuum weak — duplicate of earlier ticket. low canceled
WO-0020 Boiler — Weil 900 MBH Boiler LWCO nuisance trips during blowdown — check … medium open
WO-0019 Dock Leveler #2 Dock leveler #2 hydraulic seep — reassess after las… low open
WO-0018 Rooftop Unit RTU-2 (South) RTU-2 short-cycling returned during heat wave. medium open
WO-0017 Conveyor Line 1 Conveyor belt tracking off again at high load. high in-progress
WO-0016 Forklift — Toyota 8FGU25 Toyota forklift transmission slipping — unit out of… urgent in-progress
WO-0015 Air Compressor — Atlas 75kW Compressor tripping on high temp mid-shift. high done
WO-0014 Exhaust Fan EF-3 EF-3 squealing at startup. medium done

The board right now

Open →
  • Open3
  • In progress2
  • Done15
  • Canceled1

Drag a card between lanes on the board — moves run through the same rules the record page uses.

This month

Work orders
5
Downtime
52h
Labor cost
$314.17
Parts cost
$4,023.75
Total cost
$4,337.92

Labor is estimated at your Settings hourly rate × logged minutes; parts are logged per work order.

Low stock

All parts →
PartStockMin
Hydraulic check valve 3/4"
PRT-0004
2 2
MERV-8 filter 24x24x2
PRT-0002
6 8

Quick actions

+ Add asset + Add PM schedule Print asset tags

🤖 Your AI can operate Fixora

Claude, ChatGPT agents or n8n connect over the built-in MCP endpoint with a role-scoped key — working under the same permissions you’d give a person. Destructive and outbound actions stay human clicks.

Create an agent key Read the guide
×
Live demo — signed in as the admin, sample data resets hourly.
Own it — one payment →