WO-0020

open medium corrective · on Boiler — Weil 900 MBH AST-0011 · M. Reyes

Description

Boiler LWCO nuisance trips during blowdown — check probe.

Checklist

1 of 3 answered
Done / pass Pull and clean the LWCO probe
Open Check probe wiring for chafing
Open Run three blowdowns without a trip

Photos & documents

0 attached · PNG, JPEG or PDF, up to 10 MB
A maintenance record without a picture is one person's word about what a machine looked like. Attach a before/after photo, or the manual and the spec sheet the next technician will want.

A PDF is filed as a document whichever phase is selected — the file's content decides its type, not its name.

Parts used

0 lines · stock updates automatically
Add a part below — the stock count and the job cost both move with it.
×
Live demo — signed in as the admin, sample data resets hourly.
Own it — one payment →