PM schedules

Next due = last done + interval OR the usage trigger — whichever comes first (no cron). Due-soon window: 7 days.

TaskAssetEveryLast doneNext dueDaysUsage
Compressor oil & separator change
~2h
Air Compressor — Atlas 75kW
AST-0001
90d
2000 hours
Aug 3, 2026 Nov 1, 2026 -12 500 hours overdue
Conveyor belt tracking & tension
~45m
Conveyor Line 1
AST-0003
30d Oct 10, 2026 Nov 9, 2026 -4 — overdue
RTU-1 filter change & coil wash
~1h
Rooftop Unit RTU-1 (North)
AST-0009
60d Sep 12, 2026 Nov 11, 2026 -2 — overdue
RTU-2 filter change & coil wash
~1h
Rooftop Unit RTU-2 (South)
AST-0010
60d Sep 17, 2026 Nov 16, 2026 3 — due-soon
Forklift 250h service — Hyster
~1h 30m
Forklift — Hyster H50
AST-0007
45d
250 hours
Oct 4, 2026 Nov 18, 2026 5 -12 hours overdue
by usage
Log completion…
Boiler blowdown & low-water cutoff
~30m
Boiler — Weil 900 MBH
AST-0011
7d Nov 12, 2026 Nov 19, 2026 6 — due-soon Log completion…
CNC way lube & coolant check
~25m
CNC Mill 3-Axis — Bay 2
AST-0002
14d
500 hours
Nov 8, 2026 Nov 22, 2026 9 40 hours due-soon
by usage
Dock leveler lube & inspection
~40m
Dock Leveler #1
AST-0005
90d Sep 4, 2026 Dec 3, 2026 20 — ok
Box truck DOT inspection prep
~1h 15m
Box Truck — Isuzu NPR
AST-0013
180d
10000 km
Jul 1, 2026 Dec 28, 2026 45 6000 km ok
Exhaust fan belt & bearing check
~30m
Exhaust Fan EF-3
AST-0012
120d Sep 14, 2026 Jan 12, 2027 60 — ok
×