WO-0006

done medium preventive · on Boiler — Weil 900 MBH AST-0011 · K. Osei

Description

PM: Boiler blowdown & LWCO test.

Resolution

Blowdown done, LWCO trips correctly.

Photos & documents

0 attached · PNG, JPEG or PDF, up to 10 MB
A maintenance record without a picture is one person's word about what a machine looked like. Attach a before/after photo, or the manual and the spec sheet the next technician will want.

A PDF is filed as a document whichever phase is selected — the file's content decides its type, not its name.

Parts used

0 lines · stock updates automatically
Add a part below — the stock count and the job cost both move with it.
×
Live demo — signed in as the admin, sample data resets hourly.
Own it — one payment →