Description
PM: Dock leveler lube & inspection.
Resolution
Greased, lip weld OK, toe guards OK.
Photos & documents
0 attached · PNG, JPEG or PDF, up to 10 MBA maintenance record without a picture is one person's word about what a machine looked like. Attach a before/after photo, or the manual and the spec sheet the next technician will want.
A PDF is filed as a document whichever phase is selected — the file's content decides its type, not its name.
Parts used
0 lines · stock updates automaticallyAdd a part below — the stock count and the job cost both move with it.
Change status
Log
- Assigned to
- Dock Crew
- Opened
- Sep 25, 2026 11:00am
- Closed
- Sep 26, 2026 11:00am
- Labor
- 40m
- Downtime
- 0m
Cost
- Labor (40m @ $65.00/h)
- $43.33
- Parts (itemized, 0 lines)
- $0.00
- Parts (other)
- $45.00
- Total
- $88.33
Itemized parts are priced at consumption time; "other" is the hand-typed amount on the edit form. Labor rate comes from Settings.