Dock Leveler #2 needs-attention

AST-0006 · short link: /a/AST-0006

PM schedules (0)

Add one and Fixora tells you it is due before it fails. Add a schedule

Meters (0)

drive usage-based PM (every N hours/km)
Add a meter below — hours, kilometers, cycles — and PM can be triggered by usage instead of the calendar.

Maintenance history (2)

#TypeDescriptionCost
WO-0019 corrective Dock leveler #2 hydraulic seep — reassess after… $0.00 open
WO-0007 corrective Dock leveler #2 drifting down under load. $758.00 done

Downtime log

#OpenedDowntimeStatus
WO-0007 Aug 21, 2026 11:00am 1h 30m done

Details

  • TagAST-0006
  • CategoryWarehouse
  • LocationBuilding B — Warehouse
  • PurchasedMay 1, 2018
  • Purchase cost$6,800.00
  • AddedNov 13, 2026 5:40am

Hydraulic seep noted on last PM.

Lifetime maintenance

  • Work orders2
  • Downtime1h 30m
  • Labor$130.00
  • Parts$628.00
  • Total cost$758.00
×