Packaging Robot Cell operational

AST-0004 · short link: /a/AST-0004

PM schedules (0)

Add one and Fixora tells you it is due before it fails. Add a schedule

Meters (0)

drive usage-based PM (every N hours/km)
Add a meter below — hours, kilometers, cycles — and PM can be triggered by usage instead of the calendar.

Maintenance history (1)

#TypeDescriptionCost
WO-0008 corrective Robot cell E-stop fault, packaging halted. $2,595.00 done

Downtime log

#OpenedDowntimeStatus
WO-0008 Sep 4, 2026 11:00am 8h 30m done

Details

  • TagAST-0004
  • CategoryProduction
  • LocationBuilding A — Plant Floor
  • PurchasedJun 10, 2022
  • Purchase cost$89,750.00
  • AddedNov 13, 2026 5:40am

Lifetime maintenance

  • Work orders1
  • Downtime8h 30m
  • Labor$195.00
  • Parts$2,400.00
  • Total cost$2,595.00
×
Live demo — signed in as the admin, sample data resets hourly.
Own it — one payment →